IAC Assessment: TT0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2016
Principal Product Brake and Fuel Lines
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 160,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 8,064
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $585,688 9,532,800 kWh $0.06
Electricity Demand $331,221 26,945 kW-months/year $12.29
Natural Gas $72,031 7,533 MMBtu $9.56
TOTAL ENERGY COSTS $1,011,573
RECOMMENDED SAVINGS* $89,907 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$44,170
Cost:
$114,000
$33,980 557,000 $10,190 830 - - - - $33,980
557,000
kWh
$10,190
830
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$27,275
Cost:
$393
$21,375 350,400 $5,900 480 - - - - $21,375
350,400
kWh
$5,900
480
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,196
Cost:
$25,500
$11,196 183,540 - - - - - - $11,196
183,540
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,632
Cost:
$2,000
- - - - - - $3,632 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,632
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,023
Cost:
$1,000
$954 15,641 - - $1,069 112 - - $954
15,641
kWh
-
-
kW-months/year
$1,069
112
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,611
Cost:
$3,000
$1,611 26,410 - - - - - - $1,611
26,410
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$89,907
Cost:
$145,893
$69,116 1,132,991 $16,090 1,310 $1,069 112 $3,632 - $69,116
1,132,991
kWh
$16,090
1,310
kW-months/year
$1,069
112
MMBtu
$3,632
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost