Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2017 |
Principal Product | Food and Aerosol Cans |
NAICS | 332431 - Metal Can Manufacturing |
SIC | 3411 - Metal Cans |
Sales | $100,000,000-$500,000,000 |
# of Employees | 168 |
Plant Area (Sq.Ft.) | 325,000 |
Annual Production | 617,000,000 Units |
Production Hrs. Annual | 6,120 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $490,004 | 13,614,665 | kWh | $0.04 |
Electricity Demand | $376,109 | 27,418 | kW-months/year | $13.72 |
Natural Gas | $582,965 | 60,536 | MMBtu | $9.63 |
TOTAL ENERGY COSTS | $1,449,078 | |||
RECOMMENDED SAVINGS* | $61,936 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,353 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $22,849 Cost: $30,000 |
$(-1,322) | (-36,717) | $(-992) | (-72) | - | - | $25,163 | - |
$(-1,322) (-36,717) kWh |
$(-992) (-72) kW-months/year |
- - MMBtu |
$25,163 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $13,441 Cost: $7,000 |
$7,696 | 213,783 | $5,745 | 419 | - | - | - | - |
$7,696 213,783 kWh |
$5,745 419 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $11,488 Cost: $5,100 |
$11,488 | 319,114 | - | - | - | - | - | - |
$11,488 319,114 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,005 Cost: $24,492 |
$5,005 | 139,031 | $2,000 | 146 | - | - | - | - |
$5,005 139,031 kWh |
$2,000 146 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,947 Cost: $1,400 |
- | - | - | - | $2,947 | 306 | - | - |
- - kWh |
- - kW-months/year |
$2,947 306 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED |
Savings: $2,782 Cost: $7,000 |
- | - | - | - | $2,782 | 289 | - | - |
- - kWh |
- - kW-months/year |
$2,782 289 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,424 Cost: $125 |
$815 | 22,644 | $609 | 44 | - | - | - | - |
$815 22,644 kWh |
$609 44 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,936 Cost: $75,117 |
$23,682 | 657,855 | $7,362 | 537 | $5,729 | 595 | $25,163 | - | $23,682 657,855 kWh |
$7,362 537 kW-months/year |
$5,729 595 MMBtu |
$25,163 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,353 Cost: $12,225 |
$19,999 | 555,541 | $6,354 | 463 | - | - | - | - | $19,999 555,541 kWh |
$6,354 463 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |