Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2017 |
Principal Product | Axle Assemblies |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $100,000,000-$500,000,000 |
# of Employees | 134 |
Plant Area (Sq.Ft.) | 103,000 |
Annual Production | 96,000 Units |
Production Hrs. Annual | 4,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $75,964 | 998,400 | kWh | $0.08 |
Electricity Demand | $23,154 | 2,513 | kW-months/year | $9.21 |
Natural Gas | $7,012 | 853 | MMBtu | $8.22 |
TOTAL ENERGY COSTS | $136,130 | |||
RECOMMENDED SAVINGS* | $45,919 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,784 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $33,156 Cost: $94,000 |
- | - | - | - | - | - | $33,156 | 315,640 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$33,156 315,640 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,274 Cost: $3,000 |
$4,274 | 56,160 | - | - | - | - | - | - |
$4,274 56,160 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,861 Cost: $10,500 |
$2,510 | 32,980 | - | - | $1,351 | 164 | - | - |
$2,510 32,980 kWh |
- - kW-months/year |
$1,351 164 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,453 Cost: $8,274 |
$3,411 | 44,822 | $42 | 5 | - | - | - | - |
$3,411 44,822 kWh |
$42 5 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,175 Cost: $250 |
$634 | 8,333 | - | - | $541 | 66 | - | - |
$634 8,333 kWh |
- - kW-months/year |
$541 66 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,919 Cost: $116,024 |
$10,829 | 142,295 | $42 | 5 | $1,892 | 230 | $33,156 | 315,640 | $10,829 142,295 kWh |
$42 5 kW-months/year |
$1,892 230 MMBtu |
$33,156 315,640 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,784 Cost: $102,524 |
$4,045 | 53,155 | $42 | 5 | $541 | 66 | $33,156 | 315,640 | $4,045 53,155 kWh |
$42 5 kW-months/year |
$541 66 MMBtu |
$33,156 315,640 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |