IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2017 |
Principal Product | Automotive Shocks and Struts |
NAICS | 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $100,000,000-$500,000,000 |
# of Employees | 480 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 18,200,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,792,821 | 32,456,900 | kWh | $0.06 |
Electricity Demand | $70,906 | 13,511 | kW-months/year | $5.25 |
Natural Gas | $375,623 | 110,637 | MMBtu | $3.40 |
TOTAL ENERGY COSTS | $2,408,345 | |||
RECOMMENDED SAVINGS* | $230,974 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $188,217 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $175,487 Cost: $344,898 |
$146,852 | 2,670,098 | $1,833 | 349 | - | - | - | - | $26,802 | - |
$146,852 2,670,098 kWh |
$1,833 349 kW-months/year |
- - MMBtu |
- - Tgal |
$26,802 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $12,730 Cost: $18,400 |
- | - | - | - | $12,730 | 3,750 | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,730 3,750 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $7,986 Cost: $5,250 |
$5,252 | 95,786 | - | - | $2,734 | 805 | - | - | - | - |
$5,252 95,786 kWh |
- - kW-months/year |
$2,734 805 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,492 Cost: $11,000 |
$5,377 | 97,756 | $2,115 | 403 | - | - | - | - | - | - |
$5,377 97,756 kWh |
$2,115 403 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $7,432 Cost: $9,000 |
$7,432 | 135,125 | - | - | - | - | - | - | - | - |
$7,432 135,125 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $7,000 Cost: $20,000 |
- | - | - | - | $7,000 | 2,062 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,000 2,062 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,001 Cost: $3,000 |
$6,001 | 109,113 | - | - | - | - | - | - | - | - |
$6,001 109,113 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $3,741 Cost: $8,000 |
$541 | 9,836 | - | - | - | - | - | - | $3,200 | - |
$541 9,836 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$3,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $2,309 Cost: $10,000 |
- | - | - | - | $2,119 | 624 | $190 | 75 | - | - |
- - kWh |
- - kW-months/year |
$2,119 624 MMBtu |
$190 75 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $796 Cost: $1,453 |
$640 | 11,634 | $156 | 30 | - | - | - | - | - | - |
$640 11,634 kWh |
$156 30 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $230,974 Cost: $431,001 |
$172,095 | 3,129,348 | $4,104 | 782 | $24,583 | 7,241 | $190 | 75 | $30,002 | - | $172,095 3,129,348 kWh |
$4,104 782 kW-months/year |
$24,583 7,241 MMBtu |
$190 75 Tgal |
$30,002 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $188,217 Cost: $363,298 |
$146,852 | 2,670,098 | $1,833 | 349 | $12,730 | 3,750 | - | - | $26,802 | - | $146,852 2,670,098 kWh |
$1,833 349 kW-months/year |
$12,730 3,750 MMBtu |
- - Tgal |
$26,802 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost |