IAC logo
IAC Assessment: TT0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2017
Principal Product Military Footwear
NAICS 316210 - Footwear Manufacturing
SIC 3149 - Footwear, Except Rubber, Nec
Sales $50,000,000-$100,000,000
# of Employees 207
Plant Area (Sq.Ft.) 148,800
Annual Production 259,200 Units
Production Hrs. Annual 2,375
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,507 2,004,800 kWh $0.06
Electricity Demand $113,641 8,990 kW-months/year $12.64
Natural Gas $1,626 287 MMBtu $5.67
TOTAL ENERGY COSTS $279,046
RECOMMENDED SAVINGS* $44,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,401
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$36,700
Cost:
$4,000
- - - - - - $36,700 67,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$36,700
67,000
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,092
Cost:
$3,050
$3,092 49,400 - - - - - - - - $3,092
49,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,404
Cost:
$6,000
$1,404 22,425 - - - - - - - - $1,404
22,425
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,211
Cost:
$25
$1,211 19,350 - - - - - - - - $1,211
19,350
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,190
Cost:
$3,450
$1,095 17,497 $95 7 - - - - - - $1,095
17,497
kWh
$95
7
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$665
Cost:
$750
- - - - $665 117 - - - - -
-
kWh
-
-
kW-months/year
$665
117
MMBtu
-
-
lb
-
-
$
07: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$98
Cost:
$20
- - - - - - - - $98 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$98
-
$
TOTAL RECOMMENDED Savings:
$44,360
Cost:
$17,295
$6,802 108,672 $95 7 $665 117 $36,700 67,000 $98 - $6,802
108,672
kWh
$95
7
kW-months/year
$665
117
MMBtu
$36,700
67,000
lb
$98
-
$
TOTAL IMPLEMENTED Savings:
$4,401
Cost:
$3,095
$4,303 68,750 - - - - - - $98 - $4,303
68,750
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$98
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes