Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2018 |
Principal Product | Wet Wipes |
NAICS | 325620 - Toilet Preparation Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 540,000 |
Annual Production | 120,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $437,540 | 9,025,800 | kWh | $0.05 |
Electricity Demand | $89,261 | 19,978 | kW-months/year | $4.47 |
Natural Gas | $44,421 | 5,933 | MMBtu | $7.49 |
TOTAL ENERGY COSTS | $653,489 | |||
RECOMMENDED SAVINGS* | $143,529 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $143,529 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $94,373 Cost: $226,854 |
$67,878 | 1,414,125 | $14,563 | 3,257 | - | - | - | - | - | - | $11,932 | - |
$67,878 1,414,125 kWh |
$14,563 3,257 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
$11,932 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $25,716 Cost: $10,000 |
$22,176 | 462,000 | $3,540 | 792 | - | - | - | - | - | - | - | - |
$22,176 462,000 kWh |
$3,540 792 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,154 Cost: - |
$8,054 | 167,800 | $100 | 22 | - | - | - | - | - | - | - | - |
$8,054 167,800 kWh |
$100 22 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $4,922 Cost: $20,000 |
- | - | $4,922 | 1,106 | - | - | - | - | - | - | - | - |
- - kWh |
$4,922 1,106 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,633 Cost: $3,000 |
$4,633 | 96,517 | - | - | - | - | - | - | - | - | - | - |
$4,633 96,517 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $3,724 Cost: $5,000 |
$154 | 3,208 | - | - | - | - | $4,070 | 2,696 | - | - | $(-500) | - |
$154 3,208 kWh |
- - kW-months/year |
- - MMBtu |
$4,070 2,696 Tgal |
- - $ |
$(-500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $968 Cost: - |
$968 | 20,167 | - | - | - | - | - | - | - | - | - | - |
$968 20,167 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $637 Cost: $675 |
$288 | 6,000 | $37 | 8 | - | - | - | - | $312 | - | - | - |
$288 6,000 kWh |
$37 8 kW-months/year |
- - MMBtu |
- - Tgal |
$312 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $402 Cost: - |
$283 | 5,898 | - | - | $119 | 16 | - | - | - | - | - | - |
$283 5,898 kWh |
- - kW-months/year |
$119 16 MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $143,529 Cost: $265,529 |
$104,434 | 2,175,715 | $23,162 | 5,186 | $119 | 16 | $4,070 | 2,696 | $312 | - | $11,432 | - | $104,434 2,175,715 kWh |
$23,162 5,186 kW-months/year |
$119 16 MMBtu |
$4,070 2,696 Tgal |
$312 - $ |
$11,432 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $143,529 Cost: $265,529 |
$104,434 | 2,175,715 | $23,162 | 5,186 | $119 | 16 | $4,070 | 2,696 | $312 | - | $11,432 | - | $104,434 2,175,715 kWh |
$23,162 5,186 kW-months/year |
$119 16 MMBtu |
$4,070 2,696 Tgal |
$312 - $ |
$11,432 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes | Ancillary Material Cost |