IAC logo
IAC Assessment: TT0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2018
Principal Product Wet Wipes
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $100,000,000-$500,000,000
# of Employees 225
Plant Area (Sq.Ft.) 540,000
Annual Production 120,000 Pieces
Production Hrs. Annual 7,488
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $437,540 9,025,800 kWh $0.05
Electricity Demand $89,261 19,978 kW-months/year $4.47
Natural Gas $44,421 5,933 MMBtu $7.49
TOTAL ENERGY COSTS $653,489
RECOMMENDED SAVINGS* $143,529 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $143,529
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$94,373
Cost:
$226,854
$67,878 1,414,125 $14,563 3,257 - - - - - - $11,932 - $67,878
1,414,125
kWh
$14,563
3,257
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$11,932
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,716
Cost:
$10,000
$22,176 462,000 $3,540 792 - - - - - - - - $22,176
462,000
kWh
$3,540
792
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,154
Cost:
-
$8,054 167,800 $100 22 - - - - - - - - $8,054
167,800
kWh
$100
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,922
Cost:
$20,000
- - $4,922 1,106 - - - - - - - - -
-
kWh
$4,922
1,106
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,633
Cost:
$3,000
$4,633 96,517 - - - - - - - - - - $4,633
96,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$3,724
Cost:
$5,000
$154 3,208 - - - - $4,070 2,696 - - $(-500) - $154
3,208
kWh
-
-
kW-months/year
-
-
MMBtu
$4,070
2,696
Tgal
-
-
$
$(-500)
-
$
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$968
Cost:
-
$968 20,167 - - - - - - - - - - $968
20,167
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$637
Cost:
$675
$288 6,000 $37 8 - - - - $312 - - - $288
6,000
kWh
$37
8
kW-months/year
-
-
MMBtu
-
-
Tgal
$312
-
$
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$402
Cost:
-
$283 5,898 - - $119 16 - - - - - - $283
5,898
kWh
-
-
kW-months/year
$119
16
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$143,529
Cost:
$265,529
$104,434 2,175,715 $23,162 5,186 $119 16 $4,070 2,696 $312 - $11,432 - $104,434
2,175,715
kWh
$23,162
5,186
kW-months/year
$119
16
MMBtu
$4,070
2,696
Tgal
$312
-
$
$11,432
-
$
TOTAL IMPLEMENTED Savings:
$143,529
Cost:
$265,529
$104,434 2,175,715 $23,162 5,186 $119 16 $4,070 2,696 $312 - $11,432 - $104,434
2,175,715
kWh
$23,162
5,186
kW-months/year
$119
16
MMBtu
$4,070
2,696
Tgal
$312
-
$
$11,432
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes Ancillary Material Cost