Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2018
Principal Product Germanium and Charged Particle Detectors
NAICS 334516 - Analytical Laboratory Instrument Manufacturing
SIC 3826 - Analytical Instruments
Sales $50,000,000-$100,000,000
# of Employees 75
Plant Area (Sq.Ft.) 41,000
Annual Production 2,000 Units
Production Hrs. Annual 6,188
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $337,433 5,265,000 kWh $0.06
Electricity Demand $138,788 9,035 kW-months/year $15.36
Natural Gas $41,859 5,597 MMBtu $7.48
TOTAL ENERGY COSTS $577,476
RECOMMENDED SAVINGS* $28,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,467
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,878
Cost:
$41,788
$12,894 201,154 $5,984 390 $12,894
201,154
kWh
$5,984
390
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,922
Cost:
$9,020
$3,706 57,816 $1,216 79 $3,706
57,816
kWh
$1,216
79
kW-months/year
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,589
Cost:
$2,450
$1,915 29,879 $674 44 $1,915
29,879
kWh
$674
44
kW-months/year
04: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$1,313
Cost:
$250
$1,313 20,478 - - $1,313
20,478
kWh
-
-
kW-months/year
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$618
Cost:
$1,770
$618 9,636 - - $618
9,636
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$28,320
Cost:
$55,278
$20,446 318,963 $7,874 513 $20,446
318,963
kWh
$7,874
513
kW-months/year
TOTAL IMPLEMENTED Savings:
$21,467
Cost:
$44,238
$14,809 231,033 $6,658 434 $14,809
231,033
kWh
$6,658
434
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand