IAC Assessment: TT0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2019
Principal Product Superconducting Magnets
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $5,000,000-$10,000,000
# of Employees 48
Plant Area (Sq.Ft.) 29,880
Annual Production 120 Units
Production Hrs. Annual 2,088
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,049 564,660 kWh $0.10
Electricity Demand $8,462 1,632 kW-months/year $5.19
Natural Gas $4,046 370 MMBtu $10.94
TOTAL ENERGY COSTS $72,635
RECOMMENDED SAVINGS* $18,627 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,132
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,132
Cost:
$36,211
$9,069 91,313 $2,063 398 - - $9,069
91,313
kWh
$2,063
398
kW-months/year
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,069
Cost:
$2,280
$210 2,118 - - $3,859 353 $210
2,118
kWh
-
-
kW-months/year
$3,859
353
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,958
Cost:
$7,400
$1,827 18,396 $131 25 - - $1,827
18,396
kWh
$131
25
kW-months/year
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,435
Cost:
$30
$1,435 14,454 - - - - $1,435
14,454
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$33
Cost:
$80
- - - - $33 3 -
-
kWh
-
-
kW-months/year
$33
3
MMBtu
TOTAL RECOMMENDED Savings:
$18,627
Cost:
$46,001
$12,541 126,281 $2,194 423 $3,892 356 $12,541
126,281
kWh
$2,194
423
kW-months/year
$3,892
356
MMBtu
TOTAL IMPLEMENTED Savings:
$11,132
Cost:
$36,211
$9,069 91,313 $2,063 398 - - $9,069
91,313
kWh
$2,063
398
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas