Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2020 |
Principal Product | oven door glass, refrigerator shelving |
NAICS | 327211 - Flat Glass Manufacturing |
SIC | 3211 - Flat Glass |
Sales | $10,000,000-$50,000,000 |
# of Employees | 267 |
Plant Area (Sq.Ft.) | 244,000 |
Annual Production | 2,250,000 Units |
Production Hrs. Annual | 6,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,236,125 | 28,992,480 | kWh | $0.04 |
Electricity Demand | $848,076 | 143,721 | kW-months/year | $5.90 |
Natural Gas | $415,655 | 52,401 | MMBtu | $7.93 |
TOTAL ENERGY COSTS | $2,650,869 | |||
RECOMMENDED SAVINGS* | $77,731 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,019 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $21,455 Cost: $1,630 |
$21,455 | 503,647 | - | - | - | - |
$21,455 503,647 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $19,993 Cost: $173,628 |
$15,644 | 367,252 | $4,349 | 737 | - | - |
$15,644 367,252 kWh |
$4,349 737 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $11,285 Cost: $11,400 |
- | - | - | - | $11,285 | 1,423 |
- - kWh |
- - kW-months/year |
$11,285 1,423 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,958 Cost: $1,500 |
$9,210 | 216,197 | $1,748 | 296 | - | - |
$9,210 216,197 kWh |
$1,748 296 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $5,210 Cost: $40 |
- | - | - | - | $5,210 | 657 |
- - kWh |
- - kW-months/year |
$5,210 657 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,142 Cost: $40 |
$4,142 | 97,236 | - | - | - | - |
$4,142 97,236 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,471 Cost: $2,000 |
$2,430 | 57,035 | - | - | $41 | 5 |
$2,430 57,035 kWh |
- - kW-months/year |
$41 5 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,217 Cost: $1,350 |
$1,736 | 40,740 | $481 | 82 | - | - |
$1,736 40,740 kWh |
$481 82 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $77,731 Cost: $191,588 |
$54,617 | 1,282,107 | $6,578 | 1,115 | $16,536 | 2,085 | $54,617 1,282,107 kWh |
$6,578 1,115 kW-months/year |
$16,536 2,085 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,019 Cost: $178,798 |
$52,881 | 1,241,367 | $6,097 | 1,033 | $41 | 5 | $52,881 1,241,367 kWh |
$6,097 1,033 kW-months/year |
$41 5 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |