IAC Assessment: TT0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2021
Principal Product Space Research and Technology
NAICS 927110 - Space Research and Technology
SIC 4789 - Transportation Services, Nec
Sales <$500,000
# of Employees 6,000
Plant Area (Sq.Ft.) 2,500,000
Annual Production 1 Units
Production Hrs. Annual 2,400
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,567,358 107,975,377 kWh $0.04
Electricity Demand $2,909,273 200,346 kW-months/year $14.52
Electricity Fees $2,156,735 - $ -
Natural Gas $600,534 117,501 MMBtu $5.11
TOTAL ENERGY COSTS $10,233,900
RECOMMENDED SAVINGS* $103,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,292
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$43,816
Cost:
$1,640
$43,816 1,035,849 - - $43,816
1,035,849
kWh
-
-
kW-months/year
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$32,997
Cost:
$1,640
$32,997 780,078 - - $32,997
780,078
kWh
-
-
kW-months/year
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$20,336
Cost:
$24,200
$20,336 480,751 - - $20,336
480,751
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,140
Cost:
$7,200
$2,376 56,160 $3,764 259 $2,376
56,160
kWh
$3,764
259
kW-months/year
TOTAL RECOMMENDED Savings:
$103,289
Cost:
$34,680
$99,525 2,352,838 $3,764 259 $99,525
2,352,838
kWh
$3,764
259
kW-months/year
TOTAL IMPLEMENTED Savings:
$70,292
Cost:
$33,040
$66,528 1,572,760 $3,764 259 $66,528
1,572,760
kWh
$3,764
259
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand