IAC Assessment: TT0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2021
Principal Product Natural Gas Distribution Pipe - HDPE
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 45,600
Annual Production 36 Tons
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $517,309 8,408,400 kWh $0.06
Electricity Demand $262,390 17,629 kW-months/year $14.88
Natural Gas $6,384 512 MMBtu $12.47
TOTAL ENERGY COSTS $786,083
RECOMMENDED SAVINGS* $62,153 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,092
Cost:
$12,000
$18,092 293,000 - - - - - - $18,092
293,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 3.4155 METER WASTE WATER Savings:
$10,722
Cost:
$2,150
- - - - - - $10,722 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,722
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,816
Cost:
$5,000
- - - - $5,816 466 - - -
-
kWh
-
-
kW-months/year
$5,816
466
MMBtu
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,560
Cost:
$150
$5,560 94,341 - - - - - - $5,560
94,341
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,866
Cost:
$29,886
$4,406 71,639 $1,461 98 - - - - $4,406
71,639
kWh
$1,461
98
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$825
Cost:
$3,000
$620 10,074 $205 14 - - - - $620
10,074
kWh
$205
14
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,460
Cost:
$250
$625 10,162 - - $835 67 - - $625
10,162
kWh
-
-
kW-months/year
$835
67
MMBtu
-
-
Tgal
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$605
Cost:
$40
$605 9,838 - - - - - - $605
9,838
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,540
Cost:
$588
$2,540 41,296 - - - - - - $2,540
41,296
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,667
Cost:
$2,040
$10,667 173,448 - - - - - - $10,667
173,448
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$62,153
Cost:
$55,104
$43,114 703,798 $1,666 112 $6,651 533 $10,722 - $43,114
703,798
kWh
$1,666
112
kW-months/year
$6,651
533
MMBtu
$10,722
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption