IAC Assessment: TT0257
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0257
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2021
Principal Product Space Research and Technology
NAICS 927110 - Space Research and Technology
SIC 4789 - Transportation Services, Nec
Sales <$500,000
# of Employees 6,000
Plant Area (Sq.Ft.) 2,500,000
Annual Production 1 Units
Production Hrs. Annual 2,400
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,567,358 107,975,377 kWh $0.04
Electricity Demand $2,909,273 200,346 kW-months/year $14.52
Natural Gas $600,534 117,501 MMBtu $5.11
TOTAL ENERGY COSTS $8,077,165
RECOMMENDED SAVINGS* $203,744 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $193,805
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$185,939
Cost:
$360
$185,939 4,395,731 - - - - $185,939
4,395,731
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,293
Cost:
-
$6,293 148,771 - - - - $6,293
148,771
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,982
Cost:
$7,100
$1,672 39,520 $3,310 228 - - $1,672
39,520
kWh
$3,310
228
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,957
Cost:
$12,180
$879 20,774 - - $4,078 798 $879
20,774
kWh
-
-
kW-months/year
$4,078
798
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,573
Cost:
$3,100
$528 12,480 $1,045 72 - - $528
12,480
kWh
$1,045
72
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$203,744
Cost:
$22,740
$195,311 4,617,276 $4,355 300 $4,078 798 $195,311
4,617,276
kWh
$4,355
300
kW-months/year
$4,078
798
MMBtu
TOTAL IMPLEMENTED Savings:
$193,805
Cost:
$3,460
$192,760 4,556,982 $1,045 72 - - $192,760
4,556,982
kWh
$1,045
72
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas