IAC Assessment: TT0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2021
Principal Product Torque Convertors
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 366
Plant Area (Sq.Ft.) 500,000
Annual Production 1,040,000 Units
Production Hrs. Annual 8,400
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,530,647 24,757,068 kWh $0.06
Electricity Demand $828,529 101,977 kW-months/year $8.12
Natural Gas $422,351 52,057 MMBtu $8.11
TOTAL ENERGY COSTS $2,788,471
RECOMMENDED SAVINGS* $421,186 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $372,885
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$300,781
Cost:
$111,421
$254,899 4,122,585 $45,882 5,647 - - $254,899
4,122,585
kWh
$45,882
5,647
kW-months/year
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$62,325
Cost:
$1,640
$62,325 1,008,000 - - - - $62,325
1,008,000
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,112
Cost:
$13,000
$30,399 491,904 $713 88 - - $30,399
491,904
kWh
$713
88
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,779
Cost:
$2,738
$9,779 158,301 - - - - $9,779
158,301
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,579
Cost:
$16,000
$6,385 102,984 $1,194 147 - - $6,385
102,984
kWh
$1,194
147
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,951
Cost:
$1,314
- - - - $5,951 733 -
-
kWh
-
-
kW-months/year
$5,951
733
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,907
Cost:
$5,500
$1,907 30,873 - - - - $1,907
30,873
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,752
Cost:
$400
$1,752 28,329 - - - - $1,752
28,329
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$421,186
Cost:
$152,013
$367,446 5,942,976 $47,789 5,882 $5,951 733 $367,446
5,942,976
kWh
$47,789
5,882
kW-months/year
$5,951
733
MMBtu
TOTAL IMPLEMENTED Savings:
$372,885
Cost:
$115,799
$327,003 5,288,886 $45,882 5,647 - - $327,003
5,288,886
kWh
$45,882
5,647
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas