Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2022 |
Principal Product | Rolled Sheet Metal |
NAICS | 332322 - Sheet Metal Work Manufacturing |
SIC | 3444 - Sheet Metalwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 48 |
Plant Area (Sq.Ft.) | 218,000 |
Annual Production | 2,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,223 | 1,001,800 | kWh | $0.07 |
Electricity Demand | $44,604 | 4,401 | kW-months/year | $10.13 |
Electricity Fees | $7,366 | - | $ | - |
Natural Gas | $19,486 | 2,638 | MMBtu | $7.39 |
TOTAL ENERGY COSTS | $141,891 | |||
RECOMMENDED SAVINGS* | $52,123 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $41,003 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.663 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD |
Savings: $32,000 Cost: $3,900 |
- | - | - | - | - | - | $32,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$32,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $11,120 Cost: $138,300 |
$11,120 | 146,504 | - | - | - | - | - | - |
$11,120 146,504 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $4,496 Cost: $2,400 |
- | - | - | - | $4,496 | 608 | - | - |
- - kWh |
- - kW-months/year |
$4,496 608 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,458 Cost: $6,147 |
$1,389 | 18,304 | $1,069 | 106 | - | - | - | - |
$1,389 18,304 kWh |
$1,069 106 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,049 Cost: $1,100 |
$2,049 | 26,996 | - | - | - | - | - | - |
$2,049 26,996 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,123 Cost: $151,847 |
$14,558 | 191,804 | $1,069 | 106 | $4,496 | 608 | $32,000 | - | $14,558 191,804 kWh |
$1,069 106 kW-months/year |
$4,496 608 MMBtu |
$32,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $41,003 Cost: $13,547 |
$3,438 | 45,300 | $1,069 | 106 | $4,496 | 608 | $32,000 | - | $3,438 45,300 kWh |
$1,069 106 kW-months/year |
$4,496 608 MMBtu |
$32,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |