Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2022
Principal Product Manufactured Metal Products
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 57,900
Annual Production 2,000 Units
Production Hrs. Annual 2,040
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,704 4,265,912 kWh $0.04
Electricity Demand $164,462 12,936 kW-months/year $12.71
Natural Gas $96,173 7,875 MMBtu $12.21
TOTAL ENERGY COSTS $446,339
RECOMMENDED SAVINGS* $49,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES Savings:
$24,682
Cost:
$2,000
$17,625 405,168 $7,058 555 - - - - $17,625
405,168
kWh
$7,058
555
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,069
Cost:
$25,000
$3,366 77,377 $5,703 449 - - - - $3,366
77,377
kWh
$5,703
449
kW-months/year
-
-
$
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,223
Cost:
$27,500
- - - - $6,223 - - - -
-
kWh
-
-
kW-months/year
$6,223
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,847
Cost:
$3,500
$3,193 73,366 $655 51 - - - - $3,193
73,366
kWh
$655
51
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,648
Cost:
$2,500
$2,605 59,874 $1,044 82 - - - - $2,605
59,874
kWh
$1,044
82
kW-months/year
-
-
$
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,911
Cost:
$11,000
- - - - - - $1,911 156 -
-
kWh
-
-
kW-months/year
-
-
$
$1,911
156
MMBtu
TOTAL RECOMMENDED Savings:
$49,380
Cost:
$71,500
$26,788 615,784 $14,459 1,137 $6,223 - $1,911 156 $26,788
615,784
kWh
$14,459
1,137
kW-months/year
$6,223
-
$
$1,911
156
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu