IAC logo
IAC Assessment: TT0286
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0286
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2023
Principal Product Snack Cakes
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $100,000,000-$500,000,000
# of Employees 496
Plant Area (Sq.Ft.) 265,000
Annual Production 94,425,829 Pounds
Production Hrs. Annual 8,400
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $651,702 12,254,131 kWh $0.05
Electricity Demand $333,676 35,102 kW-months/year $9.51
Electricity Fees $(-96,203) - $ -
Natural Gas $645,742 99,156 MMBtu $6.51
TOTAL ENERGY COSTS $1,618,581
RECOMMENDED SAVINGS* $107,478 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,022
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$32,010
Cost:
$18,000
$32,010 601,695 - - - - - - $32,010
601,695
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,768
Cost:
$37,360
$12,400 233,072 $4,368 459 - - - - $12,400
233,072
kWh
$4,368
459
kW-months/year
-
-
$
-
-
MMBtu
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$15,950
Cost:
$900
- - - - - - $15,950 2,450 -
-
kWh
-
-
kW-months/year
-
-
$
$15,950
2,450
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$15,688
Cost:
$1,229
- - - - - - $15,688 2,407 -
-
kWh
-
-
kW-months/year
-
-
$
$15,688
2,407
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,412
Cost:
$17,500
- - - - $12,412 - - - -
-
kWh
-
-
kW-months/year
$12,412
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,747
Cost:
$1,210
$6,747 126,819 - - - - - - $6,747
126,819
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,352
Cost:
$3,450
$5,352 100,590 - - - - - - $5,352
100,590
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,551
Cost:
$3,200
$2,551 47,960 - - - - - - $2,551
47,960
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$107,478
Cost:
$82,849
$59,060 1,110,136 $4,368 459 $12,412 - $31,638 4,857 $59,060
1,110,136
kWh
$4,368
459
kW-months/year
$12,412
-
$
$31,638
4,857
MMBtu
TOTAL IMPLEMENTED Savings:
$75,022
Cost:
$44,260
$46,660 877,064 - - $12,412 - $15,950 2,450 $46,660
877,064
kWh
-
-
kW-months/year
$12,412
-
$
$15,950
2,450
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas