IAC logo
IAC Assessment: TT0292
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0292
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2023
Principal Product Engine Transmissions
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 264,300
Annual Production 1,100,000 Units
Production Hrs. Annual 6,900
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $642,018 9,516,030 kWh $0.07
Electricity Demand $253,025 19,692 kW-months/year $12.85
Natural Gas $34,262 3,194 MMBtu $10.73
TOTAL ENERGY COSTS $963,577
RECOMMENDED SAVINGS* $73,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,746
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$28,974
Cost:
$250
- - - - $(-87) (-8) $(-412) - $29,473 - -
-
kWh
-
-
kW-months/year
$(-87)
(-8)
MMBtu
$(-412)
-
$
$29,473
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,314
Cost:
$15,941
$11,400 168,899 $2,915 227 - - - - - - $11,400
168,899
kWh
$2,915
227
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$8,884
Cost:
$18,000
$2,739 40,579 - - $6,145 573 - - - - $2,739
40,579
kWh
-
-
kW-months/year
$6,145
573
MMBtu
-
-
$
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,900
Cost:
$600
- - - - - - - - $6,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$6,900
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,004
Cost:
$4,240
$4,527 67,060 $1,477 115 - - - - - - $4,527
67,060
kWh
$1,477
115
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,057
Cost:
$2,190
$5,057 74,918 - - - - - - - - $5,057
74,918
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,223
Cost:
$4,750
$2,223 32,936 - - - - - - - - $2,223
32,936
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,268
Cost:
$50
$1,268 18,780 - - - - - - - - $1,268
18,780
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$73,624
Cost:
$46,021
$27,213 403,172 $4,392 342 $6,058 565 $(-412) - $36,373 - $27,213
403,172
kWh
$4,392
342
kW-months/year
$6,058
565
MMBtu
$(-412)
-
$
$36,373
-
$
TOTAL IMPLEMENTED Savings:
$31,746
Cost:
$40,931
$22,686 336,112 $2,915 227 $6,145 573 - - - - $22,686
336,112
kWh
$2,915
227
kW-months/year
$6,145
573
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes