Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2023 |
Principal Product | Engine Transmissions |
NAICS | 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $100,000,000-$500,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 264,300 |
Annual Production | 1,100,000 Units |
Production Hrs. Annual | 6,900 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $642,018 | 9,516,030 | kWh | $0.07 |
Electricity Demand | $253,025 | 19,692 | kW-months/year | $12.85 |
Natural Gas | $34,262 | 3,194 | MMBtu | $10.73 |
TOTAL ENERGY COSTS | $963,577 | |||
RECOMMENDED SAVINGS* | $73,624 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $31,746 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $28,974 Cost: $250 |
- | - | - | - | $(-87) | (-8) | $(-412) | - | $29,473 | - |
- - kWh |
- - kW-months/year |
$(-87) (-8) MMBtu |
$(-412) - $ |
$29,473 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,314 Cost: $15,941 |
$11,400 | 168,899 | $2,915 | 227 | - | - | - | - | - | - |
$11,400 168,899 kWh |
$2,915 227 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $8,884 Cost: $18,000 |
$2,739 | 40,579 | - | - | $6,145 | 573 | - | - | - | - |
$2,739 40,579 kWh |
- - kW-months/year |
$6,145 573 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $6,900 Cost: $600 |
- | - | - | - | - | - | - | - | $6,900 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$6,900 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $6,004 Cost: $4,240 |
$4,527 | 67,060 | $1,477 | 115 | - | - | - | - | - | - |
$4,527 67,060 kWh |
$1,477 115 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,057 Cost: $2,190 |
$5,057 | 74,918 | - | - | - | - | - | - | - | - |
$5,057 74,918 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,223 Cost: $4,750 |
$2,223 | 32,936 | - | - | - | - | - | - | - | - |
$2,223 32,936 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,268 Cost: $50 |
$1,268 | 18,780 | - | - | - | - | - | - | - | - |
$1,268 18,780 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $73,624 Cost: $46,021 |
$27,213 | 403,172 | $4,392 | 342 | $6,058 | 565 | $(-412) | - | $36,373 | - | $27,213 403,172 kWh |
$4,392 342 kW-months/year |
$6,058 565 MMBtu |
$(-412) - $ |
$36,373 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $31,746 Cost: $40,931 |
$22,686 | 336,112 | $2,915 | 227 | $6,145 | 573 | - | - | - | - | $22,686 336,112 kWh |
$2,915 227 kW-months/year |
$6,145 573 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes |