Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2023
Principal Product Interior Trim
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 353
Plant Area (Sq.Ft.) 230,000
Annual Production 201,600 Pieces
Production Hrs. Annual 8,064
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $616,041 13,941,792 kWh $0.04
Electricity Demand $389,531 27,971 kW-months/year $13.93
Natural Gas $101,866 9,684 MMBtu $10.52
TOTAL ENERGY COSTS $1,175,262
RECOMMENDED SAVINGS* $200,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$74,585
Cost:
$185,000
$19,292 436,479 - - - - $55,293 5,256 - - - - $19,292
436,479
kWh
-
-
kW-months/year
-
-
$
$55,293
5,256
MMBtu
-
-
$
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$51,075
Cost:
$120
- - - - - - - - - - $51,075 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$51,075
-
$
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$38,784
Cost:
$10,000
- - - - - - - - $38,784 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$38,784
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,488
Cost:
$40,000
- - - - $12,488 - - - - - - - -
-
kWh
-
-
kW-months/year
$12,488
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,867
Cost:
$5
$4,009 90,698 $4,858 349 - - - - - - - - $4,009
90,698
kWh
$4,858
349
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,857
Cost:
$372
$6,857 155,145 - - - - - - - - - - $6,857
155,145
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,133
Cost:
$300
$5,133 116,122 - - - - - - - - - - $5,133
116,122
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,000
Cost:
$3,000
$2,000 45,254 - - - - - - - - - - $2,000
45,254
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$544
Cost:
$405
$544 12,306 - - - - - - - - - - $544
12,306
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$87
Cost:
$50
$59 1,343 $28 2 - - - - - - - - $59
1,343
kWh
$28
2
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$200,420
Cost:
$239,252
$37,894 857,347 $4,886 351 $12,488 - $55,293 5,256 $38,784 - $51,075 - $37,894
857,347
kWh
$4,886
351
kW-months/year
$12,488
-
$
$55,293
5,256
MMBtu
$38,784
-
$
$51,075
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $