Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2024 |
Principal Product | Germanium Detector Systems |
NAICS | 334516 - Analytical Laboratory Instrument Manufacturing |
SIC | 3826 - Analytical Instruments |
Sales | $100,000,000-$500,000,000 |
# of Employees | 270 |
Plant Area (Sq.Ft.) | 112,000 |
Annual Production | 2,600 Units |
Production Hrs. Annual | 6,188 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $490,454 | 6,409,950 | kWh | $0.08 |
Electricity Demand | $173,253 | 10,114 | kW-months/year | $17.13 |
Natural Gas | $24,283 | 1,687 | MMBtu | $14.39 |
TOTAL ENERGY COSTS | $760,303 | |||
RECOMMENDED SAVINGS* | $110,833 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,478 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Usage | Primary Raw Material | Electricity Usage | Electricity Demand | Water Usage | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $50,976 Cost: $15,000 |
$(-4,047) | (-52,560) | $(-2,136) | (-125) | - | - | $57,159 | - |
$(-4,047) (-52,560) kWh |
$(-2,136) (-125) kW-months/year |
- - Tgal |
$57,159 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $34,931 Cost: $146,400 |
$(-157) | (-2,038) | - | - | - | - | $35,088 | - |
$(-157) (-2,038) kWh |
- - kW-months/year |
- - Tgal |
$35,088 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $12,922 Cost: $5,000 |
- | - | - | - | $12,922 | 2,079 | - | - |
- - kWh |
- - kW-months/year |
$12,922 2,079 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $6,707 Cost: $1,060 |
$6,707 | 87,113 | - | - | - | - | - | - |
$6,707 87,113 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,366 Cost: $3,000 |
$3,049 | 39,603 | $1,317 | 77 | - | - | - | - |
$3,049 39,603 kWh |
$1,317 77 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $637 Cost: $125 |
$445 | 5,774 | $192 | 11 | - | - | - | - |
$445 5,774 kWh |
$192 11 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $212 Cost: $60 |
$212 | 2,753 | - | - | - | - | - | - |
$212 2,753 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $82 Cost: $174 |
$23 | 297 | $60 | 3 | - | - | - | - |
$23 297 kWh |
$60 3 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $110,833 Cost: $170,819 |
$6,232 | 80,942 | $(-567) | (-33) | $12,922 | 2,079 | $92,247 | - | $6,232 80,942 kWh |
$(-567) (-33) kW-months/year |
$12,922 2,079 Tgal |
$92,247 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,478 Cost: $6,245 |
$7,364 | 95,640 | $192 | 11 | $12,922 | 2,079 | - | - | $7,364 95,640 kWh |
$192 11 kW-months/year |
$12,922 2,079 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Usage | Primary Raw Material | Electricity Usage | Electricity Demand | Water Usage | Primary Raw Material |