IAC logo
IAC Assessment: TT0307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2024
Principal Product Labels
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 108
Plant Area (Sq.Ft.) 70,000
Annual Production 45,830,677 Units
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,399 2,893,000 kWh $0.07
Electricity Demand $95,018 7,616 kW-months/year $12.48
Natural Gas $6,321 528 MMBtu $11.97
TOTAL ENERGY COSTS $320,580
RECOMMENDED SAVINGS* $217,058 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,676
Cost:
$225
$1,676 22,838 - - $1,676
22,838
kWh
-
-
kW-months/year
02: 2.7314 REDUCE VENTILATION AIR Savings:
$5,884
Cost:
$240
$5,884 80,158 - - $5,884
80,158
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,566
Cost:
$1,450
$1,566 21,332 - - $1,566
21,332
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,477
Cost:
$3,890
$2,621 35,705 $857 69 $2,621
35,705
kWh
$857
69
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$176,493
Cost:
$288,000
$138,710 1,889,780 $37,783 3,028 $138,710
1,889,780
kWh
$37,783
3,028
kW-months/year
06: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$27,962
Cost:
$102,465
$27,962 380,963 - - $27,962
380,963
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$217,058
Cost:
$396,270
$178,418 2,430,777 $38,640 3,097 $178,418
2,430,777
kWh
$38,640
3,097
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand