Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2024 |
Principal Product | Rubber Weather Seals for Automotive Industry |
NAICS | 326291 - Rubber Product Manufacturing for Mechanical Use |
SIC | 3061 - Mechanical Rubber Goods |
Sales | $10,000,000-$50,000,000 |
# of Employees | 203 |
Plant Area (Sq.Ft.) | 161,402 |
Annual Production | 4,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $734,270 | 10,032,500 | kWh | $0.07 |
Electricity Demand | $295,501 | 20,678 | kW-months/year | $14.29 |
Natural Gas | $248,716 | 22,810 | MMBtu | $10.90 |
TOTAL ENERGY COSTS | $1,278,487 | |||
RECOMMENDED SAVINGS* | $556,861 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,143 Cost: $60 |
$7,143 | 97,595 | - | - | - | - | - | - | - | - |
$7,143 97,595 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $34,255 Cost: $2,625 |
$34,255 | 467,964 | - | - | - | - | - | - | - | - |
$34,255 467,964 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $4,207 Cost: $340 |
- | - | - | - | - | - | $4,207 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,207 - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $21,724 Cost: $2,600 |
$21,724 | 296,774 | - | - | - | - | - | - | - | - |
$21,724 296,774 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $640 Cost: $87 |
- | - | - | - | $640 | 59 | - | - | - | - |
- - kWh |
- - kW-months/year |
$640 59 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,134 Cost: $3,000 |
$6,787 | 92,720 | $1,347 | 94 | - | - | - | - | - | - |
$6,787 92,720 kWh |
$1,347 94 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $29,164 Cost: $15,000 |
- | - | - | - | $29,164 | 2,675 | - | - | - | - |
- - kWh |
- - kW-months/year |
$29,164 2,675 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,284 Cost: $1,200 |
$1,723 | 23,544 | $561 | 39 | - | - | - | - | - | - |
$1,723 23,544 kWh |
$561 39 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,234 Cost: $9,800 |
$12,159 | 166,102 | $2,075 | 145 | - | - | - | - | - | - |
$12,159 166,102 kWh |
$2,075 145 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $261,275 Cost: $200,000 |
- | - | - | - | - | - | - | - | $261,275 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$261,275 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $92,752 Cost: $120,000 |
$23,597 | 322,368 | $3,155 | 221 | - | - | - | - | $66,000 | - |
$23,597 322,368 kWh |
$3,155 221 kW-months/year |
- - MMBtu |
- - Tgal |
$66,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $81,048 Cost: $301,095 |
$81,048 | 1,107,216 | - | - | - | - | - | - | - | - |
$81,048 1,107,216 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $556,861 Cost: $655,807 |
$188,436 | 2,574,283 | $7,138 | 500 | $29,805 | 2,733 | $4,207 | - | $327,275 | - | $188,436 2,574,283 kWh |
$7,138 500 kW-months/year |
$29,805 2,733 MMBtu |
$4,207 - Tgal |
$327,275 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||