IAC Assessment: TT0318
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2024
Principal Product Bottled Water
NAICS 312112 - Bottled Water Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 71
Plant Area (Sq.Ft.) 554,040
Annual Production 1,650,755,184 Units
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,217,804 32,002,800 kWh $0.07
Electricity Demand $816,582 56,168 kW-months/year $14.54
Natural Gas $65,264 9,111 MMBtu $7.16
TOTAL ENERGY COSTS $3,340,072
RECOMMENDED SAVINGS* $591,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$519,539
Cost:
$7,626,292
$519,539 7,496,959 - - - - - - - - - - $519,539
7,496,959
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$25,497
Cost:
$30,000
$25,497 367,920 - - - - - - - - - - $25,497
367,920
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,101
Cost:
$94
$13,280 191,632 $3,821 263 - - - - - - - - $13,280
191,632
kWh
$3,821
263
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,027
Cost:
$65,640
$7,006 101,099 $2,021 139 - - - - - - - - $7,006
101,099
kWh
$2,021
139
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,815
Cost:
$1,500
$6,071 87,600 $1,744 120 - - - - - - - - $6,071
87,600
kWh
$1,744
120
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$5,885
Cost:
$12,180
$792 11,435 - - $5,093 711 - - - - - - $792
11,435
kWh
-
-
kW-months/year
$5,093
711
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
07: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$4,912
Cost:
$15,000
- - - - - - $4,353 1,200 $3,559 1,200 $(-3,000) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,353
1,200
Tgal
$3,559
1,200
Tgal
$(-3,000)
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,783
Cost:
$460
$693 10,000 $1,090 75 - - - - - - - - $693
10,000
kWh
$1,090
75
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$591,559
Cost:
$7,751,166
$572,878 8,266,645 $8,676 597 $5,093 711 $4,353 1,200 $3,559 1,200 $(-3,000) - $572,878
8,266,645
kWh
$8,676
597
kW-months/year
$5,093
711
MMBtu
$4,353
1,200
Tgal
$3,559
1,200
Tgal
$(-3,000)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost