IAC Assessment: TT0320
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0320
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2025
Principal Product Boats
NAICS 336612 - Boat Building
SIC 3732 - Boat Building And Repairing
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 312,588
Annual Production 1,600 Pieces
Production Hrs. Annual 2,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $523,008 7,353,360 kWh $0.07
Electricity Demand $269,785 19,317 kW-months/year $13.97
Electricity Fees $(-157,805) - $ -
Natural Gas $858,039 77,460 MMBtu $11.08
TOTAL ENERGY COSTS $1,503,487
RECOMMENDED SAVINGS* $155,343 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$30,976
Cost:
$12,000
$(-43) (-610) - - - - $31,019 - $(-43)
(-610)
kWh
-
-
kW-months/year
-
-
MMBtu
$31,019
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,445
Cost:
$1,710
$2,445 34,379 - - - - - - $2,445
34,379
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$17,320
Cost:
$15,000
- - - - $17,320 1,563 - - -
-
kWh
-
-
kW-months/year
$17,320
1,563
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,949
Cost:
$23,783
$8,700 122,310 $10,249 734 - - - - $8,700
122,310
kWh
$10,249
734
kW-months/year
-
-
MMBtu
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$6,052
Cost:
$7,500
- - - - - - $6,052 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,052
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,087
Cost:
$6,080
$2,087 29,340 - - - - - - $2,087
29,340
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$57,337
Cost:
$238,118
$57,337 806,091 - - - - - - $57,337
806,091
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,037
Cost:
$75,000
$10,961 154,100 $1,076 77 - - - - $10,961
154,100
kWh
$1,076
77
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,140
Cost:
$26,000
$8,140 114,433 - - - - - - $8,140
114,433
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$155,343
Cost:
$405,191
$89,627 1,260,043 $11,325 811 $17,320 1,563 $37,071 - $89,627
1,260,043
kWh
$11,325
811
kW-months/year
$17,320
1,563
MMBtu
$37,071
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost