Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2025 |
Principal Product | Custom metal assemblies |
NAICS | 332312 - Fabricated Structural Metal Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 480 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 4,998 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $492,887 | 7,181,684 | kWh | $0.07 |
Electricity Demand | $337,889 | 16,496 | kW-months/year | $20.48 |
Natural Gas | $186,038 | 27,556 | MMBtu | $6.75 |
LPG | $42,192 | 2,151 | MMBtu | $19.62 |
TOTAL ENERGY COSTS | $1,103,958 | |||
RECOMMENDED SAVINGS* | $347,291 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $160,334 Cost: $75,000 |
$(-7,548) | (-110,035) | - | - | - | - | $167,882 | - |
$(-7,548) (-110,035) kWh |
- - kW-months/year |
- - $ |
$167,882 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $83,556 Cost: - |
- | - | - | - | $83,556 | - | - | - |
- - kWh |
- - kW-months/year |
$83,556 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $42,944 Cost: $82,992 |
$25,014 | 364,634 | $17,930 | 875 | - | - | - | - |
$25,014 364,634 kWh |
$17,930 875 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $29,835 Cost: $24,750 |
- | - | - | - | $29,835 | - | - | - |
- - kWh |
- - kW-months/year |
$29,835 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,732 Cost: $35,000 |
$13,732 | 200,170 | - | - | - | - | - | - |
$13,732 200,170 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,316 Cost: $1,305 |
$7,316 | 106,657 | - | - | - | - | - | - |
$7,316 106,657 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $3,929 Cost: $13,000 |
$3,929 | 57,271 | - | - | - | - | - | - |
$3,929 57,271 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,846 Cost: $500 |
$2,686 | 39,150 | $160 | 8 | - | - | - | - |
$2,686 39,150 kWh |
$160 8 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,799 Cost: $60 |
$2,799 | 40,811 | - | - | - | - | - | - |
$2,799 40,811 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $347,291 Cost: $232,607 |
$47,928 | 698,658 | $18,090 | 883 | $113,391 | - | $167,882 | - | $47,928 698,658 kWh |
$18,090 883 kW-months/year |
$113,391 - $ |
$167,882 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost |