IAC Assessment: TT0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2025
Principal Product tire bladders
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales $10,000,000-$50,000,000
# of Employees 84
Plant Area (Sq.Ft.) 164,642
Annual Production 120,000 Units
Production Hrs. Annual 8,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $633,750 7,995,200 kWh $0.08
Electricity Demand $55,639 9,658 kW-months/year $5.76
Natural Gas $143,535 38,377 MMBtu $3.74
LPG $16,490 695 MMBtu $23.73
TOTAL ENERGY COSTS $892,449
RECOMMENDED SAVINGS* $377,637 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$242,348
Cost:
$1,045,217
$403,119 5,102,772 - - $(-64,750) (-17,313) - - - - $(-96,021) - $403,119
5,102,772
kWh
-
-
kW-months/year
$(-64,750)
(-17,313)
MMBtu
-
-
Tgal
-
-
Tgal
$(-96,021)
-
$
02: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$68,822
Cost:
$200,000
- - - - $65,206 17,435 $3,616 2,500 - - - - -
-
kWh
-
-
kW-months/year
$65,206
17,435
MMBtu
$3,616
2,500
Tgal
-
-
Tgal
-
-
$
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$30,978
Cost:
$17,480
$11,321 143,129 - - $19,657 5,256 - - - - - - $11,321
143,129
kWh
-
-
kW-months/year
$19,657
5,256
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$8,824
Cost:
$22,500
- - - - $8,768 2,344 $56 39 - - - - -
-
kWh
-
-
kW-months/year
$8,768
2,344
MMBtu
$56
39
Tgal
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,974
Cost:
$16,000
$5,392 68,000 $582 101 - - - - - - - - $5,392
68,000
kWh
$582
101
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,854
Cost:
$400
$5,854 73,825 - - - - - - - - - - $5,854
73,825
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,049
Cost:
$30,040
$5,049 63,669 - - - - - - - - - - $5,049
63,669
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,068
Cost:
$15,000
$4,068 51,300 - - - - - - - - - - $4,068
51,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,955
Cost:
$1,000
$3,569 45,000 $386 67 - - - - - - - - $3,569
45,000
kWh
$386
67
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
10: 3.4155 METER WASTE WATER Savings:
$1,047
Cost:
$1,100
- - - - - - - - $1,047 600 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,047
600
Tgal
-
-
$
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$718
Cost:
$2,640
$650 8,208 $68 12 - - - - - - - - $650
8,208
kWh
$68
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$377,637
Cost:
$1,351,377
$439,022 5,555,903 $1,036 180 $28,881 7,722 $3,672 2,539 $1,047 600 $(-96,021) - $439,022
5,555,903
kWh
$1,036
180
kW-months/year
$28,881
7,722
MMBtu
$3,672
2,539
Tgal
$1,047
600
Tgal
$(-96,021)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Ancillary Material Cost