IAC Assessment: TT0334
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0334
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2025
Principal Product Handicap lifts, pool and custom rails, pool slides
NAICS 339920 - Sporting and Athletic Goods Manufacturing
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 166,000
Annual Production 2,744,776 Units
Production Hrs. Annual 4,125
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,190 1,149,920 kWh $0.08
Electricity Demand $42,684 4,410 kW-months/year $9.68
Electricity Fees $22,234 - $ -
Natural Gas $104,914 14,712 MMBtu $7.13
LPG $14,207 561 MMBtu $25.35
TOTAL ENERGY COSTS $306,491
RECOMMENDED SAVINGS* $46,073 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$10,077
Cost:
-
- - - - - - - - $10,077 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$10,077
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,793
Cost:
$70
- - - - $7,793 - - - - - -
-
kWh
-
-
kW-months/year
$7,793
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,948
Cost:
$33,315
$8,125 100,258 $2,823 292 - - - - - - $8,125
100,258
kWh
$2,823
292
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,325
Cost:
$21,000
$6,325 78,086 - - - - - - - - $6,325
78,086
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,719
Cost:
$765
$3,719 45,925 - - - - - - - - $3,719
45,925
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,038
Cost:
$5,000
- - - - - - $3,038 426 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,038
426
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,367
Cost:
$1,185
$1,615 19,938 $752 78 - - - - - - $1,615
19,938
kWh
$752
78
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,504
Cost:
$60
$1,504 18,563 - - - - - - - - $1,504
18,563
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$303
Cost:
$435
$303 3,740 - - - - - - - - $303
3,740
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,073
Cost:
$61,830
$21,591 266,510 $3,575 369 $7,793 - $3,038 426 $10,077 - $21,591
266,510
kWh
$3,575
369
kW-months/year
$7,793
-
$
$3,038
426
MMBtu
$10,077
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost