IAC Assessment: TT0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2025
Principal Product CV Flanges, Diff Cases, Diff Lockout Collars, Drive Pinion Forgings, Helical Gears, Input Shafts, Output Gears, Diff Pinions, Side Gears, Spindles
NAICS 332111 - Iron and Steel Forging
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 316
Plant Area (Sq.Ft.) 152,050
Annual Production 10,846,374 Pieces
Production Hrs. Annual 8,568
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,687,471 39,774,481 kWh $0.04
Electricity Demand $984,499 160,560 kW-months/year $6.13
Electricity Fees $(-218,572) - $ -
Natural Gas $232,406 22,634 MMBtu $10.27
TOTAL ENERGY COSTS $2,893,748
RECOMMENDED SAVINGS* $418,315 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ Tgal $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$1,852
Cost:
$60
- - - - - - $1,852 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$1,852
-
$
02: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$78,715
Cost:
$15,000
$69,186 1,630,754 $9,529 928 - - - - $69,186
1,630,754
kWh
$9,529
928
MMBtu
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,409
Cost:
$1,885
$9,409 221,911 - - - - - - $9,409
221,911
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$263,515
Cost:
$80,000
$(-30,425) (-835,847) - - - - $293,940 - $(-30,425)
(-835,847)
kWh
-
-
MMBtu
-
-
Tgal
$293,940
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$12,543
Cost:
$4,000
$12,543 298,543 - - - - - - $12,543
298,543
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,177
Cost:
$11,250
$11,177 263,619 - - - - - - $11,177
263,619
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$4,933
Cost:
$9,000
- - - - $4,933 387 - - -
-
kWh
-
-
MMBtu
$4,933
387
Tgal
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$36,172
Cost:
$520,500
$36,172 861,260 - - - - - - $36,172
861,260
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$418,315
Cost:
$641,695
$108,063 2,440,240 $9,529 928 $4,933 387 $295,791 - $108,063
2,440,240
kWh
$9,529
928
MMBtu
$4,933
387
Tgal
$295,791
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Disposal One-time Revenue or Avoided Cost