IAC Assessment: TT0340
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0340
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2025
Principal Product Alternators
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 650,000
Annual Production 5,000 Units
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,411,870 12,840,221 kWh $0.11
Electricity Demand $469,035 29,488 kW-months/year $15.91
Natural Gas $262,379 69,965 MMBtu $3.75
TOTAL ENERGY COSTS $2,180,124
RECOMMENDED SAVINGS* $713,671 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$194,175
Cost:
$1,500
$162,072 1,473,382 $32,103 2,018 $162,072
1,473,382
kWh
$32,103
2,018
kW-months/year
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$149,724
Cost:
$887,569
$149,724 1,361,123 - - $149,724
1,361,123
kWh
-
-
kW-months/year
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$125,959
Cost:
$10,087
$125,959 1,145,088 - - $125,959
1,145,088
kWh
-
-
kW-months/year
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$76,635
Cost:
$17,000
$76,635 696,680 - - $76,635
696,680
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$66,750
Cost:
$25,000
$66,750 606,818 - - $66,750
606,818
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$48,393
Cost:
$211,862
$39,040 354,905 $9,353 588 $39,040
354,905
kWh
$9,353
588
kW-months/year
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,176
Cost:
$200,000
$44,176 401,600 - - $44,176
401,600
kWh
-
-
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,026
Cost:
$16,500
$7,026 63,870 - - $7,026
63,870
kWh
-
-
kW-months/year
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$833
Cost:
$700
$652 5,928 $181 11 $652
5,928
kWh
$181
11
kW-months/year
TOTAL RECOMMENDED Savings:
$713,671
Cost:
$1,370,218
$672,034 6,109,394 $41,637 2,617 $672,034
6,109,394
kWh
$41,637
2,617
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand