IAC logo
IAC Assessment: UA0002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2007
Principal Product Rubber pipe gaskets
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 109
Plant Area (Sq.Ft.) 85,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $388,430 6,380,128 kWh $0.06
Electricity Demand $12,000 15,395 kW-months/year $0.78
Natural Gas $366,024 32,260 MMBtu $11.35
TOTAL ENERGY COSTS $766,454
RECOMMENDED SAVINGS* $113,684 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,706
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$20,117
Cost:
$824
$20,117 327,214 - - - - $20,117
327,214
kWh
-
-
MMBtu
-
-
Tgal
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$34,488
Cost:
$1,462
- - $34,488 3,395 - - -
-
kWh
$34,488
3,395
MMBtu
-
-
Tgal
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$35,628
Cost:
$600
- - $35,628 3,139 - - -
-
kWh
$35,628
3,139
MMBtu
-
-
Tgal
04: 3.4155 METER WASTE WATER Savings:
$6,725
Cost:
-
- - - - $6,725 835,389 -
-
kWh
-
-
MMBtu
$6,725
835,389
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,648
Cost:
$15,057
$5,648 91,866 - - - - $5,648
91,866
kWh
-
-
MMBtu
-
-
Tgal
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$11,078
Cost:
$3,916
- - $11,078 976 - - -
-
kWh
$11,078
976
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$113,684
Cost:
$21,859
$25,765 419,080 $81,194 7,510 $6,725 835,389 $25,765
419,080
kWh
$81,194
7,510
MMBtu
$6,725
835,389
Tgal
TOTAL IMPLEMENTED Savings:
$46,706
Cost:
$4,516
- - $46,706 4,115 - - -
-
kWh
$46,706
4,115
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal