IAC Assessment: UA0012
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0012
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2007
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 173
Plant Area (Sq.Ft.) 225,579
Annual Production 108,770 Thousand Feet
Production Hrs. Annual 4,080
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $782,027 15,593,531 kWh $0.05
Electricity Demand $169,344 39,319 kW-months/year $4.31
Natural Gas $7,863 527 MMBtu $14.92
TOTAL ENERGY COSTS $959,234
RECOMMENDED SAVINGS* $1,070,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,155
Cost:
$700
$1,155 26,757 - - - - $1,155
26,757
kWh
-
-
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,165
Cost:
-
$2,165 50,162 - - - - $2,165
50,162
kWh
-
-
kW-months/year
-
-
$
03: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$1,063,171
Cost:
$5,532,000
$782,027 15,593,531 $169,344 39,319 $111,800 - $782,027
15,593,531
kWh
$169,344
39,319
kW-months/year
$111,800
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,620
Cost:
$9,817
$1,181 27,367 $439 105 - - $1,181
27,367
kWh
$439
105
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$737
Cost:
$7,504
$504 11,695 $233 56 - - $504
11,695
kWh
$233
56
kW-months/year
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,429
Cost:
$1,230
$1,122 26,379 $307 74 - - $1,122
26,379
kWh
$307
74
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$1,070,277
Cost:
$5,551,251
$788,154 15,735,891 $170,323 39,554 $111,800 - $788,154
15,735,891
kWh
$170,323
39,554
kW-months/year
$111,800
-
$
TOTAL IMPLEMENTED Savings:
$3,320
Cost:
$700
$3,320 76,919 - - - - $3,320
76,919
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production