Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2008
Principal Product steel castings
NAICS 331513 - Steel Foundries (except Investment)
SIC 3325 - Steel Foundries, Nec
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 48,000
Annual Production 2,900,000 Pounds
Production Hrs. Annual 2,600
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $205,055 3,016,091 kWh $0.07
Natural Gas $113,499 8,140 MMBtu $13.94
TOTAL ENERGY COSTS $318,554
RECOMMENDED SAVINGS* $39,687 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,165
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,165
Cost:
$1,644
$3,165 46,551 - - $3,165
46,551
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$252
Cost:
$2,679
$252 3,706 - - $252
3,706
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,774
Cost:
$14,051
$2,774 40,797 - - $2,774
40,797
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$682
Cost:
$402
$682 4,926 - - $682
4,926
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,325
Cost:
$55
$9,325 137,164 - - $9,325
137,164
kWh
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$23,489
Cost:
$13,600
- - $23,489 1,685 -
-
kWh
$23,489
1,685
MMBtu
TOTAL RECOMMENDED Savings:
$39,687
Cost:
$32,431
$16,198 233,144 $23,489 1,685 $16,198
233,144
kWh
$23,489
1,685
MMBtu
TOTAL IMPLEMENTED Savings:
$3,165
Cost:
$1,644
$3,165 46,551 - - $3,165
46,551
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas