IAC Assessment: UA0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2009
Principal Product Fabricated Pipe and Pipe Fittings
NAICS 332996 - Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales <$500,000
# of Employees 120
Plant Area (Sq.Ft.) 320,000
Annual Production 1 Units
Production Hrs. Annual 2,750
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,857 3,511,498 kWh $0.07
Natural Gas $16,311 997 MMBtu $16.36
TOTAL ENERGY COSTS $318,435
RECOMMENDED SAVINGS* $27,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,116
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,812
Cost:
$41,878
$9,812 131,580 $9,812
131,580
kWh
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,768
Cost:
$1,894
$3,768 59,792 $3,768
59,792
kWh
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,044
Cost:
$510
$2,044 27,403 $2,044
27,403
kWh
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,868
Cost:
-
$2,868 38,465 $2,868
38,465
kWh
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,910
Cost:
$1,500
$2,910 39,030 $2,910
39,030
kWh
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,573
Cost:
$300
$1,573 21,096 $1,573
21,096
kWh
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,782
Cost:
$1,385
$3,782 50,721 $3,782
50,721
kWh
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$350
Cost:
$610
$350 4,196 $350
4,196
kWh
TOTAL RECOMMENDED Savings:
$27,107
Cost:
$48,077
$27,107 372,283 $27,107
372,283
kWh
TOTAL IMPLEMENTED Savings:
$15,116
Cost:
$44,498
$15,116 202,209 $15,116
202,209
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage