Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2009 |
Principal Product | Medium and High Voltage Cable |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3355 - Aluminum Rolling And Drawing, Nec |
Sales | <$500,000 |
# of Employees | 215 |
Plant Area (Sq.Ft.) | 339,000 |
Annual Production | 55,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,451,368 | 23,697,890 | kWh | $0.06 |
Natural Gas | $75,219 | 4,945 | MMBtu | $15.21 |
TOTAL ENERGY COSTS | $1,526,587 | |||
RECOMMENDED SAVINGS* | $149,449 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $142,368 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $16,663 Cost: - |
$16,663 | 266,865 | - | - |
$16,663 266,865 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $14,535 Cost: $3,000 |
$14,535 | 232,784 | - | - |
$14,535 232,784 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $88,243 Cost: $220,339 |
$88,243 | 1,413,240 | - | - |
$88,243 1,413,240 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7122 DISCONNECT BALLASTS |
Savings: $2,487 Cost: $162 |
$2,487 | 39,836 | - | - |
$2,487 39,836 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,594 Cost: $680 |
$4,594 | 73,581 | - | - |
$4,594 73,581 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $19,240 Cost: $2,900 |
- | - | $19,240 | 1,265 |
- - kWh |
$19,240 1,265 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $3,687 Cost: $4,300 |
- | - | $3,687 | 242 |
- - kWh |
$3,687 242 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $149,449 Cost: $231,381 |
$126,522 | 2,026,306 | $22,927 | 1,507 | $126,522 2,026,306 kWh |
$22,927 1,507 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $142,368 Cost: $230,539 |
$119,441 | 1,912,889 | $22,927 | 1,507 | $119,441 1,912,889 kWh |
$22,927 1,507 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||