IAC logo
IAC Assessment: UA0037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2009
Principal Product corrugated cardboard and boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2652 - Setup Paperboard Boxes
Sales $100,000,000-$500,000,000
# of Employees 272
Plant Area (Sq.Ft.) 350,000
Annual Production 2,700,000 Units
Production Hrs. Annual 6,240
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $694,286 8,427,128 kWh $0.08
Natural Gas $994,543 78,851 MMBtu $12.61
TOTAL ENERGY COSTS $1,688,829
RECOMMENDED SAVINGS* $265,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $187,557
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,040
Cost:
$401
$1,040 12,629 - - $1,040
12,629
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$52,438
Cost:
$71,638
$52,438 636,470 - - $52,438
636,470
kWh
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$60,900
Cost:
$1,744
- - $60,900 5,000 -
-
kWh
$60,900
5,000
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$25,667
Cost:
$3,523
- - $25,667 2,035 -
-
kWh
$25,667
2,035
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,336
Cost:
-
$14,336 174,007 - - $14,336
174,007
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,571
Cost:
$2,500
$9,571 116,170 - - $9,571
116,170
kWh
-
-
MMBtu
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$17,492
Cost:
$25,930
$17,492 163,860 - - $17,492
163,860
kWh
-
-
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$58,174
Cost:
$32,445
- - $58,174 4,606 -
-
kWh
$58,174
4,606
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,938
Cost:
$6,000
- - $1,938 149 -
-
kWh
$1,938
149
MMBtu
10: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$836
Cost:
-
- - $836 59 -
-
kWh
$836
59
MMBtu
11: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$7,231
Cost:
$16,448
- - $7,231 573 -
-
kWh
$7,231
573
MMBtu
12: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$16,135
Cost:
$1,700
$16,135 195,838 - - $16,135
195,838
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$265,758
Cost:
$162,329
$111,012 1,298,974 $154,746 12,422 $111,012
1,298,974
kWh
$154,746
12,422
MMBtu
TOTAL IMPLEMENTED Savings:
$187,557
Cost:
$47,912
$40,042 486,015 $147,515 11,849 $40,042
486,015
kWh
$147,515
11,849
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas