IAC logo
IAC Assessment: UA0043
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2010
Principal Product Coatings for Aircraft Part
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 7699 - Repair Services, Nec
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 110,000
Annual Production 25,000 Pieces
Production Hrs. Annual 3,120
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $521,069 6,512,043 kWh $0.08
TOTAL ENERGY COSTS $521,069
RECOMMENDED SAVINGS* $30,055 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,956
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,495
Cost:
-
$2,495 47,347 $2,495
47,347
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,461
Cost:
$1,500
$4,461 55,754 $4,461
55,754
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,885
Cost:
$11,676
$5,885 73,543 $5,885
73,543
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,792
Cost:
$29,183
$13,792 81,463 $13,792
81,463
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,016
Cost:
$10,675
$2,016 25,204 $2,016
25,204
kWh
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$352
Cost:
$137
$352 4,397 $352
4,397
kWh
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,054
Cost:
$625
$1,054 13,175 $1,054
13,175
kWh
TOTAL RECOMMENDED Savings:
$30,055
Cost:
$53,796
$30,055 300,883 $30,055
300,883
kWh
TOTAL IMPLEMENTED Savings:
$6,956
Cost:
$1,500
$6,956 103,101 $6,956
103,101
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage