IAC Assessment: UA0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2010
Principal Product Catfish
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 40,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $306,498 4,681,500 kWh $0.07
Electricity Demand $64,328 12,778 kW-months/year $5.03
Electricity Fees $36,263 - $ -
Natural Gas $9,320 5,172 MMBtu $1.80
TOTAL ENERGY COSTS $444,329
RECOMMENDED SAVINGS* $62,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,074
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,526
Cost:
$53,770
$5,904 90,177 $622 124 - - - - $5,904
90,177
kWh
$622
124
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,266
Cost:
$13,725
$3,919 59,865 $347 69 - - - - $3,919
59,865
kWh
$347
69
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,400
Cost:
$1,080
$2,400 30,653 - - - - - - $2,400
30,653
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$218
Cost:
$177
$218 3,330 - - - - - - $218
3,330
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$351
Cost:
$906
$351 5,360 - - - - - - $351
5,360
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$4,505
Cost:
$1,000
$4,505 68,816 - - - - - - $4,505
68,816
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,870
Cost:
$26,550
- - - - $12,870 734 - - -
-
kWh
-
-
kW-months/year
$12,870
734
MMBtu
-
-
Tgal
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,306
Cost:
$7,045
$2,914 44,511 $392 7 - - - - $2,914
44,511
kWh
$392
7
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$27,920
Cost:
$8,875
- - - - - - $27,920 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,920
-
Tgal
TOTAL RECOMMENDED Savings:
$62,362
Cost:
$113,128
$20,211 302,712 $1,361 200 $12,870 734 $27,920 - $20,211
302,712
kWh
$1,361
200
kW-months/year
$12,870
734
MMBtu
$27,920
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,074
Cost:
$2,083
$5,074 77,506 - - - - - - $5,074
77,506
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal