Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2011 |
Principal Product | Fuel Filters |
NAICS | 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3569 - General Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 450,000 Pieces |
Production Hrs. Annual | 2,100 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $72,628 | 1,542,000 | kWh | $0.05 |
Electricity Demand | $53,298 | 5,922 | kW-months/year | $9.00 |
Electricity Fees | $22,551 | - | $ | - |
Natural Gas | $35,966 | 4,715 | MMBtu | $7.63 |
TOTAL ENERGY COSTS | $216,620 | |||
RECOMMENDED SAVINGS* | $18,196 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,370 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,459 Cost: $24,444 |
$8,531 | 181,117 | $4,410 | 490 | $518 | - | - | - | - | - |
$8,531 181,117 kWh |
$4,410 490 kW-months/year |
$518 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $668 Cost: $1,241 |
$642 | 13,637 | - | - | $26 | - | - | - | - | - |
$642 13,637 kWh |
- - kW-months/year |
$26 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,025 Cost: $800 |
$899 | 19,086 | $1,048 | 116 | $78 | - | - | - | - | - |
$899 19,086 kWh |
$1,048 116 kW-months/year |
$78 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $702 Cost: $1,100 |
$375 | 7,956 | $300 | 34 | $27 | - | - | - | - | - |
$375 7,956 kWh |
$300 34 kW-months/year |
$27 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $832 Cost: $1,935 |
- | - | - | - | - | - | $801 | 107 | $31 | - |
- - kWh |
- - kW-months/year |
- - $ |
$801 107 MMBtu |
$31 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF |
Savings: $510 Cost: $1,533 |
$490 | 10,395 | - | - | $20 | - | - | - | - | - |
$490 10,395 kWh |
- - kW-months/year |
$20 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $18,196 Cost: $31,053 |
$10,937 | 232,191 | $5,758 | 640 | $669 | - | $801 | 107 | $31 | - | $10,937 232,191 kWh |
$5,758 640 kW-months/year |
$669 - $ |
$801 107 MMBtu |
$31 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,370 Cost: $2,341 |
$1,017 | 21,593 | $300 | 34 | $53 | - | - | - | - | - | $1,017 21,593 kWh |
$300 34 kW-months/year |
$53 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost |