IAC logo
IAC Assessment: UA0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2012
Principal Product Vehicle intorior parts and window motors
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 266,000
Annual Production 365,000 Pieces
Production Hrs. Annual 6,468
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $854,913 12,425,822 kWh $0.07
Electricity Demand $850 2,833 kW-months/year $0.30
Electricity Fees $32,054 - $ -
Natural Gas $22,254 1,719 MMBtu $12.95
TOTAL ENERGY COSTS $910,071
RECOMMENDED SAVINGS* $62,146 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,899
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$23,489
Cost:
$160
$22,673 329,544 $816 - $22,673
329,544
kWh
$816
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,919
Cost:
$640
$6,679 97,074 $240 - $6,679
97,074
kWh
$240
-
$
03: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$5,106
Cost:
$2,157
$4,929 71,639 $177 - $4,929
71,639
kWh
$177
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,492
Cost:
$9,195
$13,023 189,282 $469 - $13,023
189,282
kWh
$469
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,491
Cost:
$800
$10,126 147,182 $365 - $10,126
147,182
kWh
$365
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,837
Cost:
$4,093
$1,773 25,775 $64 - $1,773
25,775
kWh
$64
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$812
Cost:
$30
- - $812 - -
-
kWh
$812
-
$
TOTAL RECOMMENDED Savings:
$62,146
Cost:
$17,075
$59,203 860,496 $2,943 - $59,203
860,496
kWh
$2,943
-
$
TOTAL IMPLEMENTED Savings:
$42,899
Cost:
$11,542
$40,625 590,465 $2,274 - $40,625
590,465
kWh
$2,274
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees