Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2012 |
Principal Product | Aerospace fastners |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 109 |
Plant Area (Sq.Ft.) | 58,000 |
Annual Production | 12,000,000 Pieces |
Production Hrs. Annual | 5,000 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $153,091 | 2,305,800 | kWh | $0.07 |
Electricity Demand | $53,560 | 6,141 | kW-months/year | $8.72 |
Electricity Fees | $9,698 | - | $ | - |
Natural Gas | $14,054 | 1,790 | MMBtu | $7.85 |
TOTAL ENERGY COSTS | $244,465 | |||
RECOMMENDED SAVINGS* | $52,931 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,816 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $11,862 Cost: $26,757 |
$11,381 | 171,430 | - | - | $481 | - | - | - |
$11,381 171,430 kWh |
- - kW-months/year |
$481 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $6,021 Cost: $2,488 |
$5,777 | 87,016 | - | - | $244 | - | - | - |
$5,777 87,016 kWh |
- - kW-months/year |
$244 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $5,678 Cost: $142 |
$5,448 | 82,060 | - | - | $230 | - | - | - |
$5,448 82,060 kWh |
- - kW-months/year |
$230 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,518 Cost: $13,900 |
$6,805 | 102,504 | $3,286 | 377 | $427 | - | - | - |
$6,805 102,504 kWh |
$3,286 377 kW-months/year |
$427 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,230 Cost: $4,203 |
- | - | - | - | $240 | - | $5,990 | 763 |
- - kWh |
- - kW-months/year |
$240 - $ |
$5,990 763 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,138 Cost: $2,200 |
$1,545 | 23,267 | $507 | 58 | $86 | - | - | - |
$1,545 23,267 kWh |
$507 58 kW-months/year |
$86 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,484 Cost: $12,249 |
$7,648 | 115,200 | $2,411 | 277 | $425 | - | - | - |
$7,648 115,200 kWh |
$2,411 277 kW-months/year |
$425 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,931 Cost: $61,939 |
$38,604 | 581,477 | $6,204 | 712 | $2,133 | - | $5,990 | 763 | $38,604 581,477 kWh |
$6,204 712 kW-months/year |
$2,133 - $ |
$5,990 763 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,816 Cost: $2,342 |
$6,993 | 105,327 | $507 | 58 | $316 | - | - | - | $6,993 105,327 kWh |
$507 58 kW-months/year |
$316 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||