Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2013
Principal Product Plastic Components
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 52
Plant Area (Sq.Ft.) 40,000
Annual Production 22,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $189,135 2,691,300 kWh $0.07
Electricity Demand $8,009 6,407 kW-months/year $1.25
Electricity Fees $10,500 - $ -
TOTAL ENERGY COSTS $213,844
RECOMMENDED SAVINGS* $33,636 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,064
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,079
Cost:
-
$12,470 177,433 - - $609 - $12,470
177,433
kWh
-
-
kW-months/year
$609
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$817
Cost:
$996
$779 11,090 - - $38 - $779
11,090
kWh
-
-
kW-months/year
$38
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,715
Cost:
$39,573
$11,739 167,033 $384 307 $592 - $11,739
167,033
kWh
$384
307
kW-months/year
$592
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,997
Cost:
$545
$1,904 27,087 - - $93 - $1,904
27,087
kWh
-
-
kW-months/year
$93
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,456
Cost:
$1,320
$3,295 46,882 - - $161 - $3,295
46,882
kWh
-
-
kW-months/year
$161
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$766
Cost:
$8
$730 14,230 - - $36 - $730
14,230
kWh
-
-
kW-months/year
$36
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$485
Cost:
$400
$437 6,213 $25 20 $23 - $437
6,213
kWh
$25
20
kW-months/year
$23
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$321
Cost:
$1,000
$292 4,159 $14 11 $15 - $292
4,159
kWh
$14
11
kW-months/year
$15
-
$
TOTAL RECOMMENDED Savings:
$33,636
Cost:
$43,842
$31,646 454,127 $423 338 $1,567 - $31,646
454,127
kWh
$423
338
kW-months/year
$1,567
-
$
TOTAL IMPLEMENTED Savings:
$32,064
Cost:
$42,434
$30,187 429,525 $384 307 $1,493 - $30,187
429,525
kWh
$384
307
kW-months/year
$1,493
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees