IAC Assessment: UA0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2013
Principal Product Livestock Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 26
Plant Area (Sq.Ft.) 25,000
Annual Production 40,000 Tons
Production Hrs. Annual 5,784
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $301,366 3,706,716 kWh $0.08
Electricity Fees $18,159 - $ -
Natural Gas $197,865 54,085 MMBtu $3.66
TOTAL ENERGY COSTS $517,390
RECOMMENDED SAVINGS* $20,745 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,625
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$6,636
Cost:
$3,420
- - - - $6,636 1,813 -
-
kWh
-
-
$
$6,636
1,813
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$564
Cost:
$426
- - - - $564 154 -
-
kWh
-
-
$
$564
154
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,409
Cost:
$510
$4,168 51,272 $241 - - - $4,168
51,272
kWh
$241
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,220
Cost:
$4,669
$3,044 37,440 $176 - - - $3,044
37,440
kWh
$176
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$347
Cost:
$1,056
$328 4,035 $19 - - - $328
4,035
kWh
$19
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,711
Cost:
$1,600
$2,563 31,524 $148 - - - $2,563
31,524
kWh
$148
-
$
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,669
Cost:
$1,900
$1,578 19,405 $91 - - - $1,578
19,405
kWh
$91
-
$
-
-
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,189
Cost:
$596
$1,124 13,826 $65 - - - $1,124
13,826
kWh
$65
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,745
Cost:
$14,177
$12,805 157,502 $740 - $7,200 1,967 $12,805
157,502
kWh
$740
-
$
$7,200
1,967
MMBtu
TOTAL IMPLEMENTED Savings:
$13,625
Cost:
$12,067
$6,074 74,706 $351 - $7,200 1,967 $6,074
74,706
kWh
$351
-
$
$7,200
1,967
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas