IAC Assessment: UA0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2013
Principal Product Tire bladders
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales >$500,000,000
# of Employees 50
Plant Area (Sq.Ft.) 178,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $560,984 8,220,800 kWh $0.07
Electricity Fees $(-28,690) - $ -
Natural Gas $145,208 30,936 MMBtu $4.69
TOTAL ENERGY COSTS $705,471
RECOMMENDED SAVINGS* $42,407 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,562
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$5,737
Cost:
$19,304
$5,737 82,886 - - - - $5,737
82,886
kWh
-
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,385
Cost:
$2,330
$10,233 150,047 $152 - - - $10,233
150,047
kWh
$152
-
$
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,177
Cost:
$878
- - - - $1,177 251 -
-
kWh
-
-
$
$1,177
251
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,965
Cost:
$49,792
$23,613 346,231 $352 - - - $23,613
346,231
kWh
$352
-
$
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,143
Cost:
$520
$1,087 15,939 $16 - $40 9 $1,087
15,939
kWh
$16
-
$
$40
9
MMBtu
TOTAL RECOMMENDED Savings:
$42,407
Cost:
$72,824
$40,670 595,103 $520 - $1,217 260 $40,670
595,103
kWh
$520
-
$
$1,217
260
MMBtu
TOTAL IMPLEMENTED Savings:
$11,562
Cost:
$3,208
$10,233 150,047 $152 - $1,177 251 $10,233
150,047
kWh
$152
-
$
$1,177
251
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas