Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2014 |
Principal Product | Recycle metal from used and obsolete oil filled electrical equipment |
NAICS | 331314 - Secondary Smelting and Alloying of Aluminum |
SIC | 3341 - Secondary Nonferrous Metals |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 67,450 |
Annual Production | 100,000,000 Pounds |
Production Hrs. Annual | 6,732 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $247,274 | 2,556,480 | kWh | $0.10 |
Electricity Demand | $35,849 | 7,563 | kW-months/year | $4.74 |
Electricity Fees | $17,647 | - | $ | - |
Natural Gas | $110,459 | 14,938 | MMBtu | $7.39 |
TOTAL ENERGY COSTS | $425,345 | |||
RECOMMENDED SAVINGS* | $55,447 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,157 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $16,982 Cost: $22,285 |
$14,828 | 153,343 | $1,218 | 257 | $936 | - | - | - | - | - |
$14,828 153,343 kWh |
$1,218 257 kW-months/year |
$936 - $ |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $9,820 Cost: $800 |
$8,374 | 86,601 | $905 | 191 | $541 | - | - | - | - | - |
$8,374 86,601 kWh |
$905 191 kW-months/year |
$541 - $ |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,145 Cost: $2,595 |
$7,201 | 74,469 | $495 | 104 | $449 | - | - | - | - | - |
$7,201 74,469 kWh |
$495 104 kW-months/year |
$449 - $ |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $7,420 Cost: $10,540 |
$7,011 | 72,503 | - | - | $409 | - | - | - | - | - |
$7,011 72,503 kWh |
- - kW-months/year |
$409 - $ |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $4,817 Cost: $23,475 |
$3,062 | 31,661 | $1,490 | 314 | $265 | - | - | - | - | - |
$3,062 31,661 kWh |
$1,490 314 kW-months/year |
$265 - $ |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,192 Cost: $1,920 |
- | - | - | - | - | - | $3,192 | 432 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$3,192 432 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $5,071 Cost: $6,000 |
- | - | - | - | - | - | $4,416 | 412 | $655 | 166 |
- - kWh |
- - kW-months/year |
- - $ |
$4,416 412 MMBtu |
$655 166 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,447 Cost: $67,615 |
$40,476 | 418,577 | $4,108 | 866 | $2,600 | - | $7,608 | 844 | $655 | 166 | $40,476 418,577 kWh |
$4,108 866 kW-months/year |
$2,600 - $ |
$7,608 844 MMBtu |
$655 166 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,157 Cost: $5,315 |
$15,575 | 161,070 | $1,400 | 295 | $990 | - | $3,192 | 432 | - | - | $15,575 161,070 kWh |
$1,400 295 kW-months/year |
$990 - $ |
$3,192 432 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal |