Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2014 |
Principal Product | Gel Coat Bathware |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 207 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 136,000 Pieces |
Production Hrs. Annual | 4,350 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $239,908 | 2,354,249 | kWh | $0.10 |
Electricity Demand | $5,342 | 1,102 | kW-months/year | $4.85 |
Electricity Fees | $14,696 | - | $ | - |
Natural Gas | $69,117 | 8,719 | MMBtu | $7.93 |
TOTAL ENERGY COSTS | $467,075 | |||
RECOMMENDED SAVINGS* | $229,632 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $92,577 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $64,943 Cost: $3,600 |
$59,644 | 582,229 | $1,629 | 336 | $3,670 | - | - | - | - | - |
$59,644 582,229 kWh |
$1,629 336 kW-months/year |
$3,670 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $57,584 Cost: $9,695 |
$51,082 | 498,649 | $3,248 | 670 | $3,254 | - | - | - | - | - |
$51,082 498,649 kWh |
$3,248 670 kW-months/year |
$3,254 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $13,870 Cost: $100 |
$11,918 | 116,339 | $1,168 | 241 | $784 | - | - | - | - | - |
$11,918 116,339 kWh |
$1,168 241 kW-months/year |
$784 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $56,812 Cost: - |
- | - | - | - | - | - | - | - | $56,812 | 4,800,000 |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$56,812 4,800,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $24,871 Cost: $70,925 |
$20,338 | 198,534 | $3,127 | 654 | $1,406 | - | - | - | - | - |
$20,338 198,534 kWh |
$3,127 654 kW-months/year |
$1,406 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $10,122 Cost: $8,800 |
$9,550 | 93,224 | - | - | $572 | - | - | - | - | - |
$9,550 93,224 kWh |
- - kW-months/year |
$572 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,430 Cost: $528 |
$586 | 5,717 | - | - | $35 | - | $809 | 102 | - | - |
$586 5,717 kWh |
- - kW-months/year |
$35 - $ |
$809 102 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $229,632 Cost: $93,648 |
$153,118 | 1,494,692 | $9,172 | 1,901 | $9,721 | - | $809 | 102 | $56,812 | 4,800,000 | $153,118 1,494,692 kWh |
$9,172 1,901 kW-months/year |
$9,721 - $ |
$809 102 MMBtu |
$56,812 4,800,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $92,577 Cost: $89,420 |
$80,970 | 790,407 | $6,375 | 1,324 | $5,232 | - | - | - | - | - | $80,970 790,407 kWh |
$6,375 1,324 kW-months/year |
$5,232 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) |