IAC logo
IAC Assessment: UA0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2014
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 88,836
Annual Production 52,618 Thousand Feet
Production Hrs. Annual 8,424
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $807,003 11,520,122 kWh $0.07
Electricity Fees $44,966 - $ -
Wood $441,418 441,418 MMBtu $1.00
TOTAL ENERGY COSTS $1,293,387
RECOMMENDED SAVINGS* $127,522 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,866
#|Description Savings
Cost
Status Electricity Usage Wood Electricity Usage Wood
$ kWh $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$18,355
Cost:
$300
$18,355 262,020 - - $18,355
262,020
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,866
Cost:
$9,095
$11,866 160,462 - - $11,866
160,462
kWh
-
-
MMBtu
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$27,986
Cost:
$37,058
- - $27,986 27,986 -
-
kWh
$27,986
27,986
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$942
Cost:
$1,018
- - $942 942 -
-
kWh
$942
942
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$68,373
Cost:
$30,376
$68,373 976,057 - - $68,373
976,057
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$127,522
Cost:
$77,847
$98,594 1,398,539 $28,928 28,928 $98,594
1,398,539
kWh
$28,928
28,928
MMBtu
TOTAL IMPLEMENTED Savings:
$11,866
Cost:
$9,095
$11,866 160,462 - - $11,866
160,462
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Wood Electricity Usage Wood