IAC Assessment: UA0127
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0127
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2014
Principal Product hardwood flooring
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $10,000,000-$50,000,000
# of Employees 102
Plant Area (Sq.Ft.) 100,000
Annual Production 9,300 Thousand Feet
Production Hrs. Annual 5,145
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $340,755 4,684,781 kWh $0.07
Wood $109,960 67,049 MMBtu $1.64
TOTAL ENERGY COSTS $450,715
RECOMMENDED SAVINGS* $46,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,708
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Wood Electricity Usage Electricity Fees Wood
$ kWh $ $ $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,119
Cost:
$9,967
$8,241 113,291 $(-122) - - - $8,241
113,291
kWh
$(-122)
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,739
Cost:
$6,195
$6,841 94,041 $(-102) - - - $6,841
94,041
kWh
$(-102)
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,280
Cost:
$1,500
$1,299 17,853 $(-19) - - - $1,299
17,853
kWh
$(-19)
-
$
-
-
MMBtu
04: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$11,493
Cost:
-
- - $11,493 - - - -
-
kWh
$11,493
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,037
Cost:
$28,162
$8,158 112,163 $(-121) - - - $8,158
112,163
kWh
$(-121)
-
$
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,431
Cost:
$95
$1,453 19,973 $(-22) - - - $1,453
19,973
kWh
$(-22)
-
$
-
-
MMBtu
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$156
Cost:
$116
$158 2,166 $(-2) - - - $158
2,166
kWh
$(-2)
-
$
-
-
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,469
Cost:
$40,000
- - - - $9,469 5,774 -
-
kWh
-
-
$
$9,469
5,774
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$220
Cost:
$790
- - - - $220 134 -
-
kWh
-
-
$
$220
134
MMBtu
TOTAL RECOMMENDED Savings:
$46,944
Cost:
$86,825
$26,150 359,487 $11,105 - $9,689 5,908 $26,150
359,487
kWh
$11,105
-
$
$9,689
5,908
MMBtu
TOTAL IMPLEMENTED Savings:
$17,708
Cost:
$48,485
$8,140 111,894 $(-121) - $9,689 5,908 $8,140
111,894
kWh
$(-121)
-
$
$9,689
5,908
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Wood Electricity Usage Electricity Fees Wood