Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2014 |
Principal Product | Cabinet |
NAICS | 337110 - Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2434 - Wood Kitchen Cabinets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 900 |
Plant Area (Sq.Ft.) | 1,400,000 |
Annual Production | 325,027 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,615,629 | 22,128,480 | kWh | $0.07 |
Electricity Demand | $478,353 | 81,077 | kW-months/year | $5.90 |
Wood | $878,409 | 501,948 | MMBtu | $1.75 |
TOTAL ENERGY COSTS | $2,972,391 | |||
RECOMMENDED SAVINGS* | $229,775 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $83,978 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Wood | Electricity Usage | Electricity Demand | Wood | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER |
Savings: $72,413 Cost: $8,000 |
$83,144 | 1,138,800 | - | - | $(-10,731) | (-6,132) |
$83,144 1,138,800 kWh |
- - kW-months/year |
$(-10,731) (-6,132) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $34,652 Cost: $100 |
- | - | - | - | $34,652 | 19,801 |
- - kWh |
- - kW-months/year |
$34,652 19,801 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $21,794 Cost: $38,871 |
$15,611 | 213,821 | $6,183 | 1,048 | - | - |
$15,611 213,821 kWh |
$6,183 1,048 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $263 Cost: $331 |
- | - | - | - | $263 | 150 |
- - kWh |
- - kW-months/year |
$263 150 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $44,851 Cost: $100 |
$37,005 | 506,848 | $7,846 | 1,330 | - | - |
$37,005 506,848 kWh |
$7,846 1,330 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $35,918 Cost: $45,024 |
$29,298 | 401,290 | $6,620 | 1,122 | - | - |
$29,298 401,290 kWh |
$6,620 1,122 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $15,672 Cost: $5,250 |
$15,672 | 214,656 | - | - | - | - |
$15,672 214,656 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,212 Cost: $7,095 |
$3,596 | 49,261 | $616 | 104 | - | - |
$3,596 49,261 kWh |
$616 104 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $229,775 Cost: $104,771 |
$184,326 | 2,524,676 | $21,265 | 3,604 | $24,184 | 13,819 | $184,326 2,524,676 kWh |
$21,265 3,604 kW-months/year |
$24,184 13,819 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $83,978 Cost: $7,626 |
$40,601 | 556,109 | $8,462 | 1,434 | $34,915 | 19,951 | $40,601 556,109 kWh |
$8,462 1,434 kW-months/year |
$34,915 19,951 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Wood | Electricity Usage | Electricity Demand | Wood |