Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2014 |
Principal Product | Protein and Oil |
NAICS | 311613 - Rendering and Meat Byproduct Processing |
SIC | 2077 - Animal And Marine Fats And Oils |
Sales | $10,000,000-$50,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 135,500,000 Pounds |
Production Hrs. Annual | 6,732 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $278,688 | 4,047,693 | kWh | $0.07 |
Electricity Fees | $29,826 | - | $ | - |
Natural Gas | $576,692 | 118,175 | MMBtu | $4.88 |
TOTAL ENERGY COSTS | $900,777 | |||
RECOMMENDED SAVINGS* | $33,424 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,471 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,273 Cost: $10,071 |
$4,972 | 72,218 | $301 | - | - | - |
$4,972 72,218 kWh |
$301 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $6,471 Cost: $2,508 |
- | - | - | - | $6,471 | 1,326 |
- - kWh |
- - $ |
$6,471 1,326 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,501 Cost: $4,321 |
$1,415 | 20,555 | $86 | - | - | - |
$1,415 20,555 kWh |
$86 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $20,179 Cost: $127,000 |
- | - | - | - | $20,179 | 4,135 |
- - kWh |
- - $ |
$20,179 4,135 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,424 Cost: $143,900 |
$6,387 | 92,773 | $387 | - | $26,650 | 5,461 | $6,387 92,773 kWh |
$387 - $ |
$26,650 5,461 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,471 Cost: $2,508 |
- | - | - | - | $6,471 | 1,326 | - - kWh |
- - $ |
$6,471 1,326 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas |