IAC Assessment: UA0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2015
Principal Product Valves and Fittings
NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 500,000
Annual Production 28,000 Tons
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,127,795 33,340,704 kWh $0.06
Electricity Demand $0 16,480 kW-months/year $0.00
Electricity Fees $(-211,194) - $ -
Natural Gas $267,629 46,524 MMBtu $5.75
TOTAL ENERGY COSTS $2,184,230
RECOMMENDED SAVINGS* $286,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,351
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$88,066
Cost:
$277,510
$98,321 1,540,597 $(-10,255) - - - $98,321
1,540,597
kWh
$(-10,255)
-
$
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$105,613
Cost:
$6,000
$155,312 2,433,600 $(-16,199) - $(-33,500) (-5,826) $155,312
2,433,600
kWh
$(-16,199)
-
$
$(-33,500)
(-5,826)
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,787
Cost:
$1,522
$23,207 363,638 $(-2,420) - - - $23,207
363,638
kWh
$(-2,420)
-
$
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$54,259
Cost:
$61,169
$60,577 949,191 $(-6,318) - - - $60,577
949,191
kWh
$(-6,318)
-
$
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,564
Cost:
$1,260
$11,794 184,802 $(-1,230) - - - $11,794
184,802
kWh
$(-1,230)
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,524
Cost:
$10,992
$8,400 131,615 $(-876) - - - $8,400
131,615
kWh
$(-876)
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$286,813
Cost:
$358,453
$357,611 5,603,443 $(-37,298) - $(-33,500) (-5,826) $357,611
5,603,443
kWh
$(-37,298)
-
$
$(-33,500)
(-5,826)
MMBtu
TOTAL IMPLEMENTED Savings:
$31,351
Cost:
$2,782
$35,001 548,440 $(-3,650) - - - $35,001
548,440
kWh
$(-3,650)
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas