IAC Assessment: UA0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2015
Principal Product Automotive Wiring
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3647 - Vehicular Lighting Equipment
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 125,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,658 1,219,800 kWh $0.07
Electricity Fees $28,982 - $ -
Natural Gas $5,183 667 MMBtu $7.77
LPG $1,857 97 MMBtu $19.14
TOTAL ENERGY COSTS $125,680
RECOMMENDED SAVINGS* $48,782 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,284
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,366
Cost:
$72,811
$31,267 425,408 $10,099 - - - $31,267
425,408
kWh
$10,099
-
$
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,680
Cost:
$1,096
$1,270 17,280 $410 - - - $1,270
17,280
kWh
$410
-
$
-
-
MMBtu
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$46
Cost:
$117
$35 474 $11 - - - $35
474
kWh
$11
-
$
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,593
Cost:
$1,875
$2,716 36,946 $877 - - - $2,716
36,946
kWh
$877
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$960
Cost:
$1,930
$726 9,880 $234 - - - $726
9,880
kWh
$234
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$320
Cost:
$100
$242 3,297 $78 - - - $242
3,297
kWh
$78
-
$
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$539
Cost:
$2,535
- - - - $539 69 -
-
kWh
-
-
$
$539
69
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$278
Cost:
$225
$210 2,857 $68 - - - $210
2,857
kWh
$68
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,782
Cost:
$80,689
$36,466 496,142 $11,777 - $539 69 $36,466
496,142
kWh
$11,777
-
$
$539
69
MMBtu
TOTAL IMPLEMENTED Savings:
$1,284
Cost:
$2,272
$971 13,211 $313 - - - $971
13,211
kWh
$313
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas